Project Album

Evolution Paving Resources 3/8

Evolution Paving Resources 3/8″ crushed pervious mix Tumwater, Washington

South Eugene High School

South Eugene High School

WalkWay™ Fine-Grain Pervious was installed in 2011 at the baseball field.  Thankfully the school district likes WalkWay™ enough they are installing WalkWay™ fine-grain behind the Softball fields now.

Fields Park Portland Oregon

Fields Park

The Fields Park in Northwest Portland used WalkWay™ to build the 990 foot long oval walking path.

Aloha Oregon Swim Center

Aloha Swim Center

The Tualatin Hills Park and Recreation District in Washington County, Oregon installed this new pervious pavement at Aloha Swim Center in 2010.  This project used Evolution StreamSafe™ A4, Evolution ParkWay™ fine-grain and Evolution WalkWay™ fine-grain mix.  THPRD has broken ground at their Sunset Swim Center parking lot where they are replacing the asphalt with a combination of StreamSafe A4™ and WalkWay™ pervious pavements.